Control 4

New Forest Home with Control 4, Home Cinema, Clipsal CBus

A fantastic project in the heart of the New Forest, Hampshire

Fantastic new build in the heart of one of the UK’s most beautiful locations - the New Forest. Great whole-home connectivity was a must here, along with integrated lighting, heating and automation controls.

  • System design

  • Project Management

  • Control4

  • Audio/Visual Distribution

  • Heatmiser

  • Home Cinema

  • Full Dual Band Data Network

 

BRANKSOME PARK PROJECT, TWO NEW BUILDS, POOLE DORSET

A beautiful project consisting of two new builds in Branksome Park, Poole. Working for Builtform Developments along with David James Architects and Jigsaw Interiors.

The Living team were employed to design the entire property, connecting and controlling each of the systems within. The end result was a fantastically simple to use home, allowing the client to market these properties as a ‘Smart Home’.

  • Full Lighting Design

  • Project Management

  • Control4

  • Clipsal C-Bus Lighting Controls

  • Audio/Visual Distribution

  • Hidden Climate Controls - CoolMaster and Heatmiser

  • CCTV throughout

  • Full Dual Band Data Network

  • Gate Automation and Door Entry

Canford Cliffs Control 4 and Home Cinema

Home Cinema, Clipsal Cbus Lighting Control and Control 4 Automation

The second project we have completed for this client, this property is set in the mature area of Canford Cliffs, Poole, Dorset.

Involved at a very early stage, the Living team worked with the entire team to deliver this stunning project.

  • Full Lighting Design

  • Project Management

  • Control4

  • CBus Lighting Controls

  • Audio/Visual Distribution

  • Hidden Climate Controls - CoolMaster and Heatmiser

  • CCTV throughout

  • Full Dual Band Data Network

Marlow Bottom project with Control 4 and Home Cinema

A lovely project rescue in Marlow Bottom

The out-going company left the client and our team quite the project to rescue. Whilst neat cables don’t usually affect the performance of the system, they can serve as evidence that there was a lack of care and attention during the design and install phase of the project, which can lead to problems.

Our team went to work, adding and removing cables, testing and improving all the way. The end result is a happy client and a useable system.

  • System Re-design

  • Project Management

  • Control4

  • Audio/Visual Distribution

  • Home Cinema

  • Full Dual Band Data Network

 

Chat Code: